> Following a number of incidents in which the streamlined Vande Bharat trainsets have hit cattle or people wandering on railway tracks, IR has been instructed to accelerate the fencing of its main lines. The Commission of Railway Safety has stipulated that tracks should be fenced or walled before 160 km/h operation can be introduced.
that sounds bit annoying (https://www.railwaygazette.com/traction-and-rolling-stock/alstom-to-build-vande-bharat-sleeper-emus/64392.article)